General Residence (Chiba prefecture)

Location:Chiba prefecture. Date:2023.01.17
Coating duration:- Construction area:2nd floor sunroom glass
Comment:We have applied a photocatalytic coating to the glass of the sunroom.
This is a general house that uses a "sprinkling system that utilizes photocatalyst performance" that pipes stored rainwater onto the glass walls. The drained water is collected and circulated in a tank installed in the garden again, just like rainwater.

Solution used: PALCCOAT CLEAR-G
Coating duration:About 6 hours
LINEで送る
Pocket